Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Save more on your purchases! discount-offer-chevron-icon
Savings automatically calculated. No voucher code required.
Arrow left icon
All Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Newsletter Hub
Free Learning
Arrow right icon
timer SALE ENDS IN
0 Days
:
00 Hours
:
00 Minutes
:
00 Seconds
Arrow up icon
GO TO TOP
Oracle Primavera Contract Management, Business Intelligence Publisher Edition v14

You're reading from   Oracle Primavera Contract Management, Business Intelligence Publisher Edition v14 A one-stop reference to concepts and usability of the core modules of a complex application with this book and ebook.

Arrow left icon
Product type Paperback
Published in Dec 2012
Publisher Packt
ISBN-13 9781849686907
Length 208 pages
Edition 1st Edition
Arrow right icon
Author (1):
Arrow left icon
Stephen Kelly Stephen Kelly
Author Profile Icon Stephen Kelly
Stephen Kelly
Arrow right icon
View More author details
Toc

Table of Contents (24) Chapters Close

Oracle Primavera Contract Management, Business Intelligence Publisher Edition v14
Credits
About the Author
About the Reviewers
www.PacktPub.com
Preface
1. Welcome to Oracle Primavera Contract Management v14 FREE CHAPTER 2. Information Overload 3. So Much to Manage 4. The Almighty Spreadsheet 5. There Is a Better Way 6. The Big Picture 7. System versus Silo 8. Follow the Money 9. The Only Constant Is Change 10. Time to Get Paid 11. Reading your Crystal Ball 12. Managing Drawings 13. Processing Submittals 14. Out in the Field 15. P6 and PCM 16. Where Do We Go from Here? 17. The New Contract Management Tool Index

What are drawings


Through the years that PCM has been used, the Drawing modules has gone through many iterations. In the past, there was a complex wizard that allowed the user to use the Drawings modules to initiate change or become a result of a change, as well as having many other branches. It was extremely complex and was met with resistance from the user community. The Drawings and Drawing Sets modules are now designed specifically for documents that will potentially be revised and distributed to multiple parties. Typically, the drawings and specifications of a project are sometimes called technical documents. This module is best used after these drawings have been issued for construction. It is not typically used for design reviews prior to being issued for construction. It can be set up to monitor those as well, but the limited collaboration aspects of PCM limit the true design review comments as they would be visible to anyone assigned to the drawing. The "Issued for Construction...

lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $15.99/month. Cancel anytime
Visually different images